Structural Integrity Test of Volta Hall Annex Building

Construction Supervision Structural Integrity Testing Structures

Country:
Ghana
Project location within Country:
Accra
Name & Address of Client:

University of Ghana, Legon

Start Date (Month/Year):
August 2016
Completion Date (Month/Year):
September 2016
Duration of Assignment:
1 month
Name of Associated Consultant(s) (if any):
  1. John Pinkrah – Geotechnical / Materials Engineer
  2. Steve Pinkrah – Geotechnical / Materials Engineer
No. of Key Personnel:
4

Key Personnel-Months:
1 month

Professional Personnel Involved:
  1. Geotechnical / Materials Engineer
  2. Civil Engineer (Structural Design)

Approx. Value of Project:
N/A

Approx. Value of Services:
GH¢ 38,238.00
No. of Personnel Months provided by Associated Consultant(s):
0.5 months
Name(s) of Firms Nominated Personnel Involved and Functions Performed:

  1. A.L Ashong- Lamptey - Civil Engineer (Structural Design)
  2. Nana K.M Vroom - Civil Engineer (Structural Design)
Narrative Description of Project:

The project consists of four blocks of four- storey each covering an area of 1800m2 which is being used as a hostel facility.

The Consultant was to determine the structural soundness of the building that had undergone deterioration and is being used as a hostel facility.

The consultant was also to propose remedies to halt the deterioration.